Pile Driving for Highway 8 Interchange Bridges

Pile driving for the future Highway 8 and Stoney Trail interchange has begun and is expected to continue until January 2022. Pile driving involves a pneumatic (air) hammer striking steel piles, which creates a repetitive pinging or hammering sound. Adjacent residents can expect increased noise and may feel some vibrations while piling is ongoing.

Project Update – November 8, 2021

What’s Happening in Traffic This Week Temporary Construction Crossing on Highway 8 A temporary construction crossing will be in operation the week of November 15, 2021, for approximately three days for trucks to haul material to the area south of Highway 8. To minimize traffic impacts the signalized crossing will be controlled by on-site personnel and will […]

Temporary Construction Crossing on Highway 8

Approximately 2,000 cubic metres of fill is needed to construct the eastbound Highway 8 lanes, south of the existing road. A temporary construction crossing will be in operation for approximately three days the week of November 15, 2021, for haul trucks to deliver material to this area. To minimize traffic impacts the signalized crossing will […]

Trans-Canada Highway Traffic Stoppage

At 8 a.m. on Sunday, November 7, the Trans-Canada Highway will be closed just west of Valley Ridge Boulevard N.W. for about five minutes. Traffic will be stopped in both directions to allow utility crews to pull cable across the road. Some traffic delays can be expected but will clear up quickly.

Project Update – November 1, 2021

What’s Happening in Traffic This Week Eastbound Trans-Canada Highway Reduced to One Lane From 8 a.m. to 3 p.m. each day until November 5, 2021, the right lane on eastbound Trans-Canada Highway will be closed east of Old Banff Coach Road. Please expect delays. Single Lane of Alternating Traffic on 17 Avenue S.W. (Township Road […]

Project Update – October 25, 2021

What’s Happening in Traffic This Week Crestmont Boulevard S.W. Fully Closed for 15 Minutes Tomorrow, October 26, Crestmont Boulevard S.W. will be fully closed for approximately 15 minutes between 10 a.m. and 11 a.m. to install an electrical pole. Traffic Stoppages on 17 Avenue S.W. East of 101 Street S.W. On Tuesday, October 26, from […]