Pile Driving for Highway 8 Interchange Bridges

Pile driving for the future Highway 8 and Stoney Trail interchange has begun and is expected to continue until January 2022. Pile driving involves a pneumatic (air) hammer striking steel piles, which creates a repetitive pinging or hammering sound. Adjacent residents can expect increased noise and may feel some vibrations while piling is ongoing.