Forebay Construction July 2020
Sediment forebays are located at each major inlet to trap sediment and preserve the capacity of the main pond.
Forebay Construction July 2020
Sediment forebays are located at each major inlet to trap sediment and preserve the capacity of the main pond.
Stormline Installation July 2020
Installing a stormline between the bridges.
Stormline Installation July 2020
Installing a stormline between the bridges.
Piling Abutments July 2020
The piles are marked for length to determine the depth driven and verify the number of blows on the pile driver.
Abutment Piles Complete July 2020
Looking south at the piles for the north and south bridge abutments
Forming Bridge Deck July 2020
Once the girders are installed it takes several weeks to form the bridge deck
Earthworks For Future Road July 2020
Crews excavate and grade the future 109 Street SW
Retaining Wall Concrete Poured July 2020
The concrete for a portion of the retaining wall next to Valley Ridge Heights NW is poured with the mountain motif.
Progress on Grading and Geogrid July 2020
Excavation for Bridge Abutment July 2020
Looking north with the Trans-Canada Highway visible in the background
Centre Pier Construction July 2020
Forming centre pier
Centre Pier Construction July 2020