Bow River Pathway Temporary Closure – No Detour Available

Please note: The pathway closure was postponed due to poor weather conditions. It is now expected to reopen in early June.

The pathway connecting Valley Ridge and Bowness Park on the south side of the Bow River is fully closed to allow crews to remove a section of the pathway and tie in the new pathway alignment. There is no pathway detour available, nor is there access to the Bow River pedestrian bridge to or from the west. Pathway access to and from the east remains open.

The pathway is expected to reopen on the new alignment in early June.

Pathway users can expect heavy equipment and construction personnel in the area for the remainder of the project. Please look for detour and closure signs in the area. Thank you for your patience during construction.