Tower crane installation

This week, two tower cranes will be installed on the north side of the Bow River for construction on the new Bow River Bridge. In 2021 the cranes will be moved to the south side of the river for the remainder of the project. The cranes will be used to efficiently move materials up to the elevated work areas.

Photo of a tower crane being used in the construction of bridge piers.